Welcome to Shanghai ANDME official website!

ANDME service hotline:

0573-85012235

WeChat
Your location:index > cases > Railway tunnels > Shi Wu line high-speed rail
all

 

Project Name: Reinforcement of high - speed railway on Shiwu Line
Engineering materials: anchorage glue
Engineering time: 2014

 

Beijing-Guangzhou-Shenzhen-Hong Kong Passenger Dedicated Line, the main line is 840.7 kilometers in length, the speed of stone Wu high-speed railway design target of 350 km / h, the Beijing-Guangzhou high-speed rail passenger dedicated line, Hour, transmission capacity of 80 million one-way / year. The total investment of the project is estimated to be RMB 116.76 billion yuan, which is jointly invested by the Ministry of Railways and Hebei Province, Henan Province and Hubei Province. The total construction period is four and a half years. Among them, the territory of Hebei Province, 203 km, Henan section of 507 km, Hubei section of 130 km. 

 

 

The traction power supply, communication signal, centralized control and safety detection system are all made in China, which can meet the requirements of high-speed (high-speed), high-speed rail The train's high ride comfort requirements to ensure the safety of the train running punctuality.
Andre and the United States and the relevant units, high-speed rail section of the internal rail between the reinforced concrete and concrete implantation between the United States and Germany-specific anchorage rubber, enhance the stability of the track.